EV Charger Installation Connecticut
A Level 2 home EV charger adds 20–30 miles of range per hour vs. 3–5 miles from a standard outlet. TJF Electric installs permitted, inspected Level 2 hardwired chargers and NEMA 14-50 outlets for Tesla, Ford, GM, Rivian, and all EV brands across Connecticut. Charge fully overnight, every night.

Level 1 vs Level 2 vs DC Fast — Which Do You Need?
Level 1 (120V)
3–5 miles/hour
20–50 hours for full charge
Fine for short daily drives. Not ideal for most EV owners.
Level 2 (240V)
20–30 miles/hour
4–8 hours for full charge
✅ The right choice for most homes. TJF Electric specializes in this.
DC Fast Charge
100–200 miles/30 min
30–60 min for most EVs
Commercial only. Not suitable for residential installation.
The Connecticut EV Charger Protection Package
Everything you get when you call TJF Electric — zero hidden fees
- ✅Free same-day estimate — we come to you$150FREE
- ✅Full safety inspection of your electrical system$200FREE
- ✅Written scope of work before we start$75FREE
- ✅Owner Tyler on every single job — no subsPriceless
- ✅10-year workmanship guarantee in writingFREE
- ✅CT licensed & fully insured — 100% protectedFREE
Frequently Asked Questions — EV Charger Installation
How much does EV charger installation cost in Connecticut?
A Level 2 EV charger installation in CT typically costs $400–$900 for the electrical work, plus the cost of the charger unit ($200–$700). If a panel upgrade is needed, that is priced separately. TJF Electric provides free estimates including a panel assessment.
Do I need a permit to install an EV charger in CT?
Yes — Level 2 EV charger installations require an electrical permit in Connecticut. TJF Electric pulls the permit and schedules the CT electrical inspection as part of every install.
Will my current electrical panel support a Level 2 charger?
Most modern CT homes with 200A service have capacity for a Level 2 charger. Older homes with 100A panels may need an upgrade first. Tyler assesses your panel for free as part of the EV charger estimate.
Which EV charger brands do you install?
TJF Electric installs Tesla Wall Connector, ChargePoint, Emporia, Grizzl-E, JuiceBox, and any other Level 2 EVSE unit. We also install NEMA 14-50 outlets that work with portable Level 2 adapters for any EV brand.
How long does EV charger installation take?
Most EV charger installations take 2–4 hours on the day of install. Permit approval typically takes 3–7 business days beforehand. After installation, you can begin charging the same day.
Ready to Charge Your EV at Home in CT?
Free estimate including panel assessment. Serving all of Tolland County and Eastern Connecticut.
